Buy commercial train rides direct from factory: tell us your site area, inaasahang bisita, uri ng ruta at ginustong sistema ng kuryente, and we will reply with a factory-direct quotation for a trackless sightseeing train, scenic railway or theme park train ride within one working day.
Hindi mo kailangan ng tapos na detalye para makipag-ugnayan sa amin — ipadala ang site at mga numero ng bisita na mayroon ka na, at ang aming mga inhinyero ay magmumungkahi ng tren, formation at track package na akma.
Pangalan, bansa, uri at lugar ng site, inaasahang bisita araw-araw, gustong uri at kapasidad ng tren, at kung gusto mo ng lithium battery o diesel-electric drive.
Sa loob ng isang araw ng trabaho, matatanggap mo ang inirerekomendang modelo, pagbuo, mga opsyon at isang naihatid na presyo — walang margin ng dealer sa chain.
Kapag nakumpirma na ang configuration, naglalabas kami ng layout at track drawings, simulan ang produksyon (karaniwang 3–6 na linggo para sa mga karaniwang modelo) at ayusin ang pagpapadala gamit ang dokumentasyon sa pag-export.
Hindi sigurado kung aling saklaw ang itatanong? Subaybayan ang mga tren 24–202 upuan → · Mga walang track na tren 24–72 upuan → · Kumpletuhin ang mga proyekto sa riles →
A rough site plan and visitor estimate are enough for the first review. These five inputs let DINIS confirm the platform, energy system and operating scope without waiting for a finished engineering package.
| Project input | What it determines |
|---|---|
| Passenger target | Expected passengers per departure, peak-hour demand and desired service frequency. |
| Route drawing | Loop length, stop positions, narrowest road width and available turning area. |
| Terrain | Steepest gradient, road surface, drainage and any steps or restricted access points. |
| Drive and depot | Lithium, lead-acid or diesel preference; charging or refuelling location and parking area. |
| Climate and theme | Bukas, roofed or enclosed carriages; air conditioning; branding, character work and customer experience goals. |
Compare the 24–40, 42/72 and antique trackless platforms → · Review route, charging and depot planning →