Minn ferrovija waħda għal ferrovija xenika sħiħa — ippjanar u provvista ta' tagħmir DINIS.
DINIS tforni ferroviji u proġetti kompluti tal-ferroviji — disinn tar-rotot, binarju, stazzjonijiet, pontijiet u ippjanar tal-operat.

Pakkett komplet tal-ferrovija xeniċi — ferrovija, binarju, stazzjonijiet, bridges and budget — designed around your site's terrain and visitor targets.
Ara Soluzzjoni →
Ippjana attrazzjoni mmexxija mill-ferrovija għall-park tat-tema tiegħek — tqassim tal-linja, żoni tal-istazzjon, ippjanar tal-kapaċità u l-ferrovija t-tajba għall-fluss tal-viżitaturi tiegħek.
Ara Soluzzjoni →
Il-pakkett sħiħ tal-binarji wara kull ferrovija xenika DINIS: ferrovija, sleepers, it-tqegħid tas-saborra, pontijiet, stazzjonijiet u disinji tal-pjattaformi.
Ara Soluzzjoni →
Ippjana u tħaddem ferrovija turistika mingħajr binarji — disinn tar-rotta, ippjanar tal-kapaċità u l-batterija jew il-ferrovija tat-triq diesel it-tajba għall-post tiegħek.
Ara Soluzzjoni →Il-biċċa l-kbira tal-proġetti jsegwu erba' stadji — mill-ewwel studju tar-rotta għal ferroviji f'servizz ta' kuljum. Kull stadju jista' wkoll jiġi fornut waħdu jekk diġà għandek parti mill-ambitu kopert.
Aħna nirrevedu l-pjan tas-sit tiegħek, il-fluss tal-viżitaturi u t-tul tar-rotta, imbagħad jipproponi kapaċità tal-ferrovija, allinjament u baġit ta' investiment għal-linja kollha.
Soluzzjoni tal-ferrovija tal-binarji taż-żona xeniċi →406 binarju gauge mm, sleepers, stazzjonijiet, l-imħażen u l-pontijiet huma maħduma u fornuti bħala pakkett wieħed bi tpinġijiet tat-tqegħid.
Sistema tal-binarji u installazzjoni →Għall-parks aħna nqabblu l-ferrovija ma 'żoni tematiċi, stazzjonijiet tal-imbark, juru l-ħin u l-ġestjoni tal-kju tal-quċċata.
Soluzzjoni tal-ferrovija tal-park b'tema →Fejn l-ebda ferrovija ma hija possibbli, ferroviji tat-toroq tal-batterija jkopru toroq pedonali, resorts u kampus bl-istess ippjanar operattiv.
Operazzjoni turistika bla binarji →Ibgħatilna l-pjan tas-sit tiegħek għal proposta ta’ rotta u baġit →
Start with the site constraint and passenger target. The table separates equipment-only supply from a complete railway project, so the first proposal matches the scope you actually need.
| Solution | Typical project trigger | DINIS scope | Next step |
|---|---|---|---|
| Scenic area track train solution | Fixed route with high visitor flow | Route study, ferrovija, 406 mm track, stations and drawings | View solution → |
| Track system installation | New railway or an existing train that needs track | Ferrovija, sleepers, pjanċi tal-ħut, ballast drawings, stazzjonijiet u pontijiet | View solution → |
| Theme park train solution | The ride must support themed areas and queue flow | Themed train, stazzjonijiet tal-imbark, route planning and operating layout | View solution → |
| Trackless tourist operation | No rail is possible or the route must stay flexible | Road train, route review, charging or diesel plan and depot guidance | View solution → |
See reference equipment, spejjeż tal-binarji u tal-għażla → · Send a site plan for a scoped proposal →
The same train and track engineering can be supplied as equipment only, as train plus track, or as a turnkey railway. Merkanzija, taxes and local civil works remain separately identified in every model.
| Delivery path | DINIS scope | Client scope | Best for |
|---|---|---|---|
| Equipment only | Ferrovija, selected production options, test run, manuals and export packing | Track, civil works, installation and local approvals | Buyer already has a railway contractor and route design |
| Ferrovija + track package | Ferrovija, ferrovija, sleepers, fasteners, track drawings and station layouts | Earthworks, concrete bases, installation and local permits | Site already has a preferred civil contractor |
| Ferroviji xeniċi turnkey | Disinn tar-rotot, ferrovija, 406 mm track, stazzjonijiet, pontijiet, installation guidance and operator training | Land access, local permits and agreed civil works | A single-company project brief and coordinated delivery |
You do not need a finished engineering package. These six inputs are enough to prepare a first train, track and operating proposal.
| Information | How it changes the proposal |
|---|---|
| Site plan or boundary drawing | Defines the available alignment, pożizzjonijiet tal-istazzjon, depot area and any buildings or roads to avoid. |
| Expected daily and peak visitors | Sets the required seats per departure, service frequency and whether one train is enough at peak. |
| Target route length and ride time | Determines train speed, timetable, track quantity and the number of stopping or turning points. |
| Terrain, grade and curve constraints | Drives alignment design, civil works, powered-axle requirements and the safe operating envelope. |
| Battery or diesel preference | Sets charging or refuelling infrastructure, operating range and the supporting depot layout. |
| Budget stage and target date | Allows the proposal to separate immediate equipment needs from later track, station and fleet expansion. |
Send your site plan and passenger target → · Review reference equipment and track costs →
The first proposal is structured so you can compare equipment cost, site work and operating assumptions without waiting for a complete engineering design.
| Output | What it answers |
|---|---|
| Route and alignment drawing | Shows the recommended train path, pożizzjonijiet tal-istazzjon, turning areas, curves and depot access. |
| Train recommendation and formation | Connects the passenger target to model, seating capacity, number of carriages and power system. |
| Track and civil-work quantities | Identifies rail, sleepers, saborra, stazzjonijiet, bridges and the scope expected from local contractors. |
| Factory-direct equipment budget | Separates train, options and track equipment from freight, taxes, civil works and installation. |
| Delivery and commissioning plan | Sets production, shipping, installation support, operator training and staged-expansion milestones. |